Hi,
I have 3 objects
-Projects
-Task1 (with a numeric field in it call time and connected with projects)
-Sum_time_task1
And I was trying to get a field with the sum of time on the task 1 by project but for some reason I haven been able to do it.
Can somebody help me with this?